Facilities

Facilities Services helps keep Evergreen running

We provide a clean, comfortable, safe and well maintained physical environment suitable to the dynamic learning experience for which The Evergreen State College is nationally acclaimed.

Place a Facilities Work Request

Brick Paver Replacement - Phase II

During spring, Facilities Services, will repave two areas of the campus. More information about the Brick Paver Project - Phase II can be found by following the link.

CRC - Housing ADA Ramp Construction Project

Beginning March 27th, work will begin to replace and reconfigure the ADA wheelchair ramp and pedestrian walkway that serves as the primary connection between campus housing and main campus. Details regarding the CRC - Housing ADA Ramp Construction Project can be found by following the link.

Lab I - Compressed Gas Storage Shed Construction 

Starting coming Monday, April 17th, construction will begin on the new Compressed Gas Storage Shed. For more details, please follow the link here: Compressed Gas Storage Shed .

Facilities Services Organization Chart

(To view the image in a larger format, right click and open in a new tab.)

Master Plans

2016 RAD Master Plan Volume I (PDF)  Volume II (PDF)

2014 updated Campus Master Plan Volume I (PDF)Volume III (PDF)

2008 Campus Master Plan Volume I (PDF)Volume II (PDF)Volume III (PDF)

1998 Campus Master Plan Part I (PDF), Part II (PDF), Part III (PDF), Attachments 1-9 (PDF)

1972 Campus Master Plan (PDF)

 

Indigenous Arts Campus - Master Plan

Evergreen hosts thousands of visitors every year, and the Longhouse is a primary campus attraction as the college’s premiere gathering space. The creation of the Longhouse’s Indigenous Arts Campus will provide intriguing new indoor and outdoor spaces for people to gather, interact, and learn more about Indigenous Arts and Cultures from around the Pacific Rim and Pacific Northwest.

Indigenous Arts Campus - Master Plan (PDF)